主页
学科
搜索
账户
常见问题
当前学科:车辆通行费收费员
题目:
问答题
文明收费站标准中要求收费站内无治安隐患,符合“四防”标准,请问“四防”的具体内容是什么?
答案:
<查看本题扣1积分>
查看答案
答案不对?请尝试站内搜索
推荐知识点:
肺栓塞溶栓治疗药物及溶栓方案叙述错误的是()
关于事故调查组织,()的调查,应执行国务院《企业职工伤亡事故报告和处理规定》及其他相关规定。
一般情况下,以下()操作不会引起系统运行中的突发事件。
喷混凝土的取样方法,不合理的是()。
Write down the numbers of the topic sentences in the following passages.(1)Jane and Karen have many things in common.(2) To begin with, both girls have the same background. (3)Jane was born and raised in the West, and so was Karen. (4)Next, both girls are interested in the same kinds of subjects in school.(5) Jane likes French, history, and English. (6)In the same way, Karen likes Spanish, history and English. (7)Furthermore, both girls want to be teachers. (8)Jane plans to become an elementary school teacher. (9)But Karen wants to be a high school teacher.(10) As you can see, the two girls are almost like twins.
刚体受三力作用而处于平衡状态,则此三力的作用线()
背景某公司中标一座地铁车站工程,车站基础全长约212m,宽度21m,开挖深度为16m,采用明挖法施工。围护结构为地下连续墙,采用锁口管接头;设三道609钢管支撑。场地土层自上而下分别为填土、黏土和粉土地层。地下水位于地表下1m左右。基坑北侧有三条需要重点保护的地下管线,其中一条横穿基坑;东侧基坑一倍开挖深度范围内邻近一座条形基础的老旧房屋,开挖时如果变形过大对其结构安全的影响很严重;基坑南侧邻近一条市政道路。项目部编制了施工组织设计,拟在基坑内侧采用管井降水,降水井按每250m一口管井布置。方案中的地下连续墙施工工序为:开挖沟槽→修筑导沟→开挖沟槽(注入泥浆)→清除槽底淤泥和残渣→吊放接头管。项目部编制了基坑监测方案,并且决定自行监测,监测方案由上一级主管部门签字认可后实施。基坑开挖至粉土时,由于地下连续墙接头夹泥而发生渗漏,项目采取导管引流并且用聚氨酯封堵后没有效果;渗漏渐渐导致水土流失,基坑后土体出现明显沉陷。如果继续发展可能会导致基坑坍塌。2.问题(1)根据《建筑基坑支护技术规范》JGJ120-2012,该基坑支护结构属于哪一级?(2)对于横穿基坑的管线应该如何处理?(3)本基坑至少需要布置几处降水井?(4)方案中地下连续墙的工序不全,请补充。(5)项目部监测方案编制及审批过程存在哪些不妥之处?(6)针对施工过程中出现的渗漏情况,项目部应采取什么措施?
蒸汽锅炉的暖管时间约为()h左右。
驾驶人在行车中经过积水路面时,应特别注意()速慢行。
在检测桑塔纳2000的灯光系统时,发现左前大灯远光不亮,但右前远光正常,故判断远光的保险没问题,问题在保险到左前大灯的电路或左前大灯灯泡故障。